Steam Water Hammer Accident Investigation and Steam Training


Kirsner Consulting Engineering logo
Wayne Kirsner, P.E. / Principal

photo3-9

Tennessee State University -- Tunnel Steam Piping Investigation -- Observations
Overall plan of the steam tunnel that summarizes the observations You are here

Photo 3-9.

Water drips at UV-8 in south B Tunnel emanating from vertical shaft above.

Share by: