Photo 3-14. Broken Guide (B-247)
Broken guide south of broken Anchor 17 at UV-9 in south B CR Line. Note bow in condensate line. (See Photo 1-11 for a discussion of why guides are critical to operation of expansion joints). Principal investigator Wayne Kirsner, PE of Kirsner Consulting Engineers shown pointing to broken guide and bowed condensate return line. |