|  | Photo 3-1. Broken anchor weld at site of T-5 and EJ-5 has permitted pipe to shift eastward.  (M-500) Note the paucity of weld material. It looks like another bad weld as discussed previously at A-20 in photo 1-10. | |
|  |  |  | |
|  |  | ||
|  |  | ||
|  |  | ||
|  |  | ||
|  |  |  |  | |
|  |   |   |   |   | 
 
  
 |  |  | |
|  |  |  | 
|  | Photo 3-1. Broken anchor weld at site of T-5 and EJ-5 has permitted pipe to shift eastward.  (M-500) Note the paucity of weld material. It looks like another bad weld as discussed previously at A-20 in photo 1-10. | |
All Rights Reserved | Kirsner Consulting Engineering