|
|
|
|
|
![]() |
||
|
![]() |
||
|
![]() |
||
|
![]() |
|
|
|
|
|
|
![]() |
![]() |
![]() |
![]() |
|
|
|
|
![]() |
![]() |
|
Photo 3-1. Broken anchor weld at site of T-5 and EJ-5 has permitted pipe to shift eastward. (M-500) Note the paucity of weld material. It looks like another bad weld as discussed previously at A-20 in photo 1-10. |
All Rights Reserved | Kirsner Consulting Engineering