Tennessee State University -- Tunnel Steam Piping Investigation -- Observations
Overall plan of the steam tunnel that summarizes the observations You are here

Photo 2-19.

Calcium encapsulated trap assembly T-52 (the big lump is the trap) below vertical riser to Boyd hall at UV-12. Substantial steam leak is blowing to opposite side of hand.