Steam Water Hammer Accident Investigation and Steam Training


Kirsner Consulting Engineering logo
Wayne Kirsner, P.E. / Principal

photo2-10A

Tennessee State University -- Tunnel Steam Piping Investigation -- Observations
Overall plan of the steam tunnel that summarizes the observations You are here

Photo 2-10A.

Guide located east of EJ-7 pulled west out of sleeve indicates expansion joint /anchor problem. (Refer to problems to the east.)

Share by: