Overall plan of the steam tunnel that summarizes the observations You are here

Photo 2-10. (M-974)

Jammed expansion joint EJ-7 fully compressed on west side. Approximately 2” of slip should be showing at 185 deg F per “Failures” Spreadsheet. ("Click" to open Failures spreadsheet as a PDF document)