Steam Water Hammer Accident Investigation and Steam Training


Kirsner Consulting Engineering logo
Wayne Kirsner, P.E. / Principal

photo2-1

Tennessee State University -- Tunnel Steam Piping Investigation -- Observations
Overall plan of the steam tunnel that summarizes the observations You are here

Photo 2-1.

Trap T-3 between 12” steam pipe and wall (to left) is difficult, but not impossible, to access. Trap was valved OFF. Check was corroded.

Share by: