Tennessee State University -- Tunnel Steam Piping Investigation -- Observations
Overall plan of the steam tunnel that summarizes the observations You are here

Photo 1-3. Tunnel A Utility Vault (UV) - 2 (A-1433)

1-3. Calcium deposits on what we thought was an expansion joint slip at the time of the inspection (however the drawings do not indicate a horizontal expansion joint in this position.)