Photo 1-3. Tunnel A Utility Vault (UV) - 2 (A-1433) 1-3. Calcium deposits on what we thought was an expansion joint slip at the time of the inspection (however the drawings do not indicate a horizontal expansion joint in this position.) |
||
| |
|
|
|
| |
|||
| |
|||
| |
|||
| |
|||
| |
|
|
|
|
| |
|
|
|
|
| |
|
|
|
| |
![]() |
![]() |
|
| |